{"id":187,"date":"2013-02-12T13:45:13","date_gmt":"2013-02-12T20:45:13","guid":{"rendered":"http:\/\/sites.ulethbridge.ca\/facilities\/?p=187"},"modified":"2026-01-21T14:20:47","modified_gmt":"2026-01-21T21:20:47","slug":"floors-across-campus-getting-facelifts","status":"publish","type":"post","link":"https:\/\/sites.ulethbridge.ca\/facilities\/2013\/02\/12\/floors-across-campus-getting-facelifts\/","title":{"rendered":"Floors across campus getting facelifts"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" class=\"size-thumbnail wp-image-200 alignleft\" alt=\"davonian walkway small 2\" src=\"http:\/\/sites.ulethbridge.ca\/facilities\/files\/2013\/02\/davonian-walkway-small-2-150x150.jpg\" width=\"150\" height=\"150\" \/>The Caretaking department has been busy refurbishing floors across the University of Lethbridge.<\/p>\n<p>After the success of the renewed aggregate concrete flooring in the Physical Education Building last summer, Caretaking took its floor polishing skills to the University Centre for the Arts Atrium, which is being stripped, ground and polished during evenings and weekends to ensure the least amount of interruption possible.<\/p>\n<p>The 5,800 sq. ft. area should be completed in time for the Canada-wide Science Fair taking place at the U of L in May. Due to uneven floors, some dust may escape the grinding\/polishing machine.<\/p>\n<p>The original 1967 hardwood floor near CJ\u2019s food services has also been refurbished. It was sanded and sealed to revive the natural wood colour.<\/p>\n<p>Meanwhile, another flooring project is taking place in the Devonian walkway linking the Library building to UCA.<\/p>\n<p>Caretaking crews are working to strip 13 years of wax from the floor, a task that hasn\u2019t been taken on since the Library was built in 2000.<\/p>\n<p>The floor is actually made of rubber, not linoleum, and as such, the sealer finish used all those years ago wasn\u2019t the correct type, thus discolouring the floor. In addition, the floor area doesn\u2019t get much oxygen which has created an atmosphere for the planters to form yellow rings on the floor due to oxidization.<\/p>\n<p>Once the floor is stripped and a special rubber sealer is applied, the yellow rings will begin to fade and the original colour will shine through. The project should be completed by the first week of March.<\/p>\n<p>In an effort to create better pedestrian traffic flow, the planters and seating will be replaced in the centre of the walkway making a natural right and left lane for people to walk. This trial will last about a month to determine its effectiveness. If unsuccessful, the plants will be returned to their original setting.<\/p>\n<p>The Grounds department will maintain the plants to ensure they are not a pedestrian safety issue.<\/p>\n<p>The digital signage televisions will remain where they are.<\/p>\n<p>The Caretaking department\u2019s next flooring project is set to take place in the Hall of Honour outside the Library doors. Minor work on this area has already begun on the floor edges when Caretaking workers are not able to access the Atrium.<\/p>\n<p>For more information contact Facilities at 403-329-2602.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Caretaking department has been busy refurbishing floors across the University of Lethbridge. After the success of the renewed aggregate concrete flooring in the Physical Education Building last summer, Caretaking took its floor polishing skills to the University Centre for &hellip; <a href=\"https:\/\/sites.ulethbridge.ca\/facilities\/2013\/02\/12\/floors-across-campus-getting-facelifts\/\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":56,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":"","_links_to":"","_links_to_target":""},"categories":[14,57,27,6],"tags":[76,78,73,23,70,35,77,72,71,75,74,122],"class_list":["post-187","post","type-post","status-publish","format-standard","hentry","category-caretaking","category-facilities-2","category-grounds","category-project-updates","tag-atrium","tag-canada-wide-science-fair","tag-devonian","tag-environment","tag-flooring","tag-library","tag-pe-building","tag-plants","tag-polishing","tag-uca","tag-walking","tag-caretaking"],"_links":{"self":[{"href":"https:\/\/sites.ulethbridge.ca\/facilities\/wp-json\/wp\/v2\/posts\/187","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/sites.ulethbridge.ca\/facilities\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/sites.ulethbridge.ca\/facilities\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/sites.ulethbridge.ca\/facilities\/wp-json\/wp\/v2\/users\/56"}],"replies":[{"embeddable":true,"href":"https:\/\/sites.ulethbridge.ca\/facilities\/wp-json\/wp\/v2\/comments?post=187"}],"version-history":[{"count":8,"href":"https:\/\/sites.ulethbridge.ca\/facilities\/wp-json\/wp\/v2\/posts\/187\/revisions"}],"predecessor-version":[{"id":271,"href":"https:\/\/sites.ulethbridge.ca\/facilities\/wp-json\/wp\/v2\/posts\/187\/revisions\/271"}],"wp:attachment":[{"href":"https:\/\/sites.ulethbridge.ca\/facilities\/wp-json\/wp\/v2\/media?parent=187"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/sites.ulethbridge.ca\/facilities\/wp-json\/wp\/v2\/categories?post=187"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/sites.ulethbridge.ca\/facilities\/wp-json\/wp\/v2\/tags?post=187"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}